Site Search
Regulatory Documentation

Central Iowa Power Cooperative's 5-Year Integrated Resource Plan (IRP) Download PDF (File size: 1.3 MB)


This IRP represents the collective interests of CIPCO and its
individual RECs and SIMECA municipal utilities, as named,
in accordance with WAPA’s Member-Based Association
(MBA) filing status.

Central Iowa Power Cooperative • P.O. Box 2517 Cedar Rapids, IA 52406-2517
Phone: (319) 366-8011 Fax:(319) 366-8626 • Contact Us
Web Design by Love Scott & Associates   Web Development by DWebware